The power company of Simorphic

The plant behind the meter. Zero megawatts from the grid.

Enermorphic LLC develops, owns and operates the generation that energizes Simorphic data center campuses. The plant sits on the campus, is sized to the campus and answers to one owner.

Status, November 2026: a Texas company wholly owned by Simorphic. First generation equipment targeted for deployment in Q1 2027.

300 MW island plant dispatch, illustrative

6 of 7LM6000 units online
12%reserve above campus load
0 MWimported from the grid
Committed generationCampus loadCarrying loadOnline as reserveStandby
A concept animation, not live data. It shows the operating rule we design to: committed generation stays at least one unit ahead of campus load. Seven 58 MW units: six can carry 300 MW and the seventh is reserve.

Where things stand, November 2026

Turbines lined up. Texas land closing.

650 MWof gas turbines secured or in process by Enermorphic's Global Equipment Council for 2027 deployment
9.9 GWplanned across the two Bluebonnet campuses in South Texas
5 of 6planned Simorphic campuses designed for behind-the-meter power
7+ GWdelivered by Simorphic's engineering and design partners over their careers

Project Bluebonnet, scaled to 300 MW

What the first 300 MW looks like

A concept view of a 300 MW block at Bluebonnet. Natural gas arrives at the fence, LM6000 turbines turn it into power on the campus bus, and the compute sits a short feeder away in shipping containers cooled by a sealed loop. Select a part of the drawing, or a tab, to see what it does.

300 MWcampus load in this block
58 MWper LM6000 unit, running on natural gas
6 + 1units: six carry the load, one stands in reserve
0 MWdrawn from the utility grid

Concept illustration, not to scale. Unit and container counts, voltages and tag numbers are indicative.

What we do

One job: put firm power on the campus bus

A data center is only as early as its power. Simorphic's model is to own the generation outright, and Enermorphic is the company that carries that responsibility from the equipment order through decades of operation.

  1. Develop

    Size the plant to the campus, phase by phase, and carry the plant through design, air permitting and fuel interconnection alongside Simorphic's site team.

  2. Procure

    Take delivery of long-lead generation equipment sourced through Enermorphic's Global Equipment Council, starting with LM6000 gas turbines rated at 58 MW each.

  3. Build

    Install and commission generation in step with the data halls, so each phase of compute has power waiting for it.

  4. Operate

    Run the plant around the clock: dispatch, fuel, maintenance and outage planning under one operator accountable to the campus.

Structure

Wholly owned by Simorphic. Built around its campuses.

Enermorphic exists so that the power plant and the data center share one owner. There is no third-party power seller between the turbine and the server.

Suppliers
Enermorphic LLC
Simorphic, LLC
FuelContracted supply delivered to the plant fence
GenerationLM6000 gas turbines on natural gas, with room for more sources
Plant switchyardProtection, metering and the campus bus
DistributionMedium-voltage feeders to each hall
Halls and XPUsThe load the plant was sized for
Utility grid: no interconnection needed to energize a behind-the-meter campus.

Planned division of work between the two companies. The source mix for each campus will be announced with that campus.

Single line diagram, 300 MW block

A typical arrangement for a 300 MW natural gas fed compute site. Seven generators connect through their own breakers and step-up transformers to a split campus bus. Six feeders leave the bus, one per compute block, and each ends at the XPUs.

Breaker closedBreaker open34.5 kV campus busNatural gas

Typical arrangement for illustration. Voltages, bus layout and feeder counts are indicative and will follow detailed design.

Campuses

Texas first, then wherever Simorphic builds behind the meter

Enermorphic's first work is in South Texas, where Simorphic is closing on the Bluebonnet I site and holds an exclusive option on Bluebonnet II. Three more Simorphic campuses are planned on behind-the-meter power.

CampusRegionPlanned capacityPowerStatus
Bluebonnet ISouth Texas6.6 GWBehind the meter, multiple sourcesLand closing November 2026
Bluebonnet IISouth Texas3.3 GWBehind the meter, multiple sourcesExclusive option held
OklahomaOklahomaTo be announcedBehind the meterPlanning
South AmericaLocation to be announced100 MWBehind the meterPlanning
Central AsiaLocation to be announcedTo be announcedBehind the meterPlanning

All campuses are in planning. Capacity figures are Simorphic's planned campus capacity, not installed generation. Simorphic's sixth planned site, 50 MW in Virginia, is grid connected.

Standards we design to

Owning the plant means owning its record

An operator with one customer and no grid behind it has nowhere to hide an outage, an emission or a noise complaint. These are the commitments the plant is being designed around.

Reliability

One unit ahead, always

Generation is planned with spare capacity online, so the loss of any single unit does not reach the halls.

Emissions

Efficient machines, current controls

We plan modern, efficient generation with current emissions controls, and layouts that leave room to add lower carbon sources over time.

Neighbors

Load that stays off the local grid

A behind-the-meter plant means the campus does not add its full load to the grid that serves nearby homes and businesses.

Safety

One program, plant and halls

A single safety program with Simorphic covers construction and operations on both sides of the plant fence.

Leadership

Who is accountable

Kirby BlackPresident and Manager, Enermorphic LLC

Leads Enermorphic and is responsible for the plant from equipment delivery through operations.

  • 40+ yearsacross crude oil marketing, logistics, transportation and settlement
  • Founderof an energy logistics firm serving the oil and gas sector
  • Expertisein lease purchasing and transportation infrastructure

Work with Enermorphic

Selling machines, fuel or the skill to run them?

Tell us what you supply, where and by when. A person on the Enermorphic team will read it.

Generation equipment makersTurbines, engines, storage, transformers and switchgear with real delivery slots.
Fuel suppliers and pipelinesFirm, long-term supply to sites in South Texas and beyond.
Builders and operatorsEPC, commissioning and long-term service partners for utility-scale plant.
Capital partnersGeneration assets with a single, affiliated offtaker on the same site.

Your inquiry goes directly to the Enermorphic team.